This project included research, acquisition of Preliminary Title Reports, field surveys, and preparation of base map drawings for the design of new street and landscaping improvements in the downtown area of the City of Sacramento, California. Work was conducted in heavy traffic conditions along 12 blocks of urban areas. Field surveys included location of existing utility facilities, driveways, traffic lanes, existing building corners, and other existing improvements within the project corridor. Field surveys were also conducted to locate the areas underneath the existing sidewalks known as “hollow sidewalks”.  A comprehensive base map was prepared, field reviewed, and submitted to our client.

Tags: